Tag Archives: Millbrook Flood Prevention Scheme

Work underway on phase two of Millbrook Flood Defences in Axminster

Preliminary work has started on the second phase of the Millbrook Flood defence scheme in Axminster including channel widening downstream of the railway and installation of a debris grill

Posted on: 19 September 2016 | Posted in: Environment